The electricians and plumber were busy today. At the end of the day, they got a lot done but the kitchen looks more “undone” today. The plumbers ran a new line from the sink to the new fridge and got rid of the old line (by cutting a small hole in the floor).
The Inspector General (Ravel) was checking things out after everyone left today.
The electrician put in new outlets, ran a bunch of new wires for the undercabinet lighting and generally cut holes in the wall. Thankfully all this area will be covered with backsplash tile or cabinets.
Here ends Day 3.
No comments:
Post a Comment