Ravel has a lot to check out this afternoon. The tile guy made some serious progress.
I had forgotten we spent a lot of time deciding whether the tiles should be horizontal or vertical.
Bryce (tile guy) got most of the bathtub surround done today.
He or someone also framed the niche.
Good thing he was working alone because he has a lot of equipment.
Despite all this stuff in the bathroom, I was really impressed that he vacuumed at the end of the day and even vacuumed the cardboard area by the front door.
No comments:
Post a Comment