It's been a while because... it's been a while....
We have finally have some updates on the bathroom. Today was an exciting day as the glass as installed.

It really turned out nice! As with all construction projects, it wasn't without chaos and drama.
The installer arrived this morning. As with all the College City Design Build workers, he was super cheerful, polite and nice. He upstairs and got started. He came down a little while later and said there was a problem. The glass was the wrong size, would have to be reordered and he didn't know when it would be installed. He said the hole for the electrical in the mirror was also cut in the wrong spot so that would have to be redone. He was clearly annoyed, as was I. He left and I was getting ready to
chew out call the Project Manager to find out what was going on.
The doorbell rang and it was the installer again. He said he couldn't believe it was wrong and stopped driving to look at the plan again. It turns out he read the plan wrong and the glass was right. So.... he cheerfully got back to work.
 |
Unofficial Cat Perch |
Later this afternoon, he came downstairs and said there was yet another problem. Something wasn't lining up with something (he said words but I didn't know what he meant) so he was on the phone with someone. They got it figured out - I suspect it was whatever had him stumped this morning.
In the end, he finished and it looks really, really nice! Unfortunately, the mistake with the mirror will push off the electrician by a day but we should (SHOULD!) be completely finished by the end of the week. The project is about a week behind schedule but in the end, it's not bad when it's such a beautiful finished project.